The new plant covers an area of ​​about 100,000 square meters and is expected to be put into operation in 2012. At present, Qiqi is raising about RMB 2 billion in CB. The company said it is not convenient to disclose the capacity, product planning and recent operation information of Chengdu plant.
It is understood that in addition to the wonderful, DELL, NB system factory Compal (2324), Wistron (3231) also settled in Chengdu. Therefore, it is inferred from the customer group near the Qiqi Chengdu Plant that the plant may use PC thermal module products as the main capacity/product line in the future.
The Preformed Suspension Clamp is used to ADSS cable on the line support and connect immediate support or support of angle less than 25°, one set of each tower. The cilping strength 10%-20% RTS(Rated Tensile Strength), and the recommended span>200m.The Preformed Helical fittings include inner preformed armor rods, outer preformed rods, a suspension head (a pair of aluminium clamp, a pair of plastic inserts, a set of bolts, lock nuts, and lock washers etc.) Eye Chain Link, Anchor shackle.
Preformed Suspension Clamp
Preformed Suspension Clamp,Preformed Cable Suspension Clamp,Preformed Suspension Clamp Tension Set,Preformed Aluminum Suspension Clamp,Preformed Suspension Clamp with Connectors
Jiangsu Chuandu Electrical Technology Co.,Ltd. , http://www.cdepf.com