Guangdong Power Grid Co., Ltd. Power Dispatching Control Center September 2016 Bulletin Tender Bidding Announcement
Announcement time: 2016-9-20
I. Project Information
(I) Project Name: Guangdong Power Grid Co., Ltd. Power Dispatching Control Center September 2016 Bidding for Material Lots
(B) Source of funds: own funds
(3) Bidding mode: open tendering, post-qualification review.
(4) Tenderee: Electric Power Dispatching Control Center of Guangdong Power Grid Co., Ltd.
(V) Address of the tenderer: No. 75 Meihua Road, Yuexiu District, Guangzhou
(VI) Tendering Service Unit: Guangdong Power Grid Co., Ltd. Tender Service Center
(8) The validity period and application scope of the tender result: It shall be ended on December 31, 2016 from the date of approval of the tender result. This tender is applicable to the Power Distribution Control Center of Guangdong Power Grid Co., Ltd. September 2016
Second, the tender subject information
1. List of subject matter and subcontracting
The subject name of the subject package corresponds to the arrival date of the item
1 AC/DC hybrid power grid intelligent delisting control and self-healing recovery system Package 1: Intelligent AC/DC hybrid power grid decoupling control and self-healing application software AC/DC hybrid power grid intelligent decoupling control and self-healing recovery technology 2017 Before October 31st
Package 2: Terminal workstations before December 31, 2016
2 PC Server Upgrade, Capacity Expansion, and Control Center Management and Control System Expansion by December 31, 2016
Remarks: The bidder must submit the registration information in accordance with the standard package.
Third, the specific requirements for the purchase of tender documents
(1) Qualification requirements of bidders (compared with the requirements of the bidding scheme)
General qualifications:
1. Legal entities or other organizations registered legally operating within the territory of the People's Republic of China have the ability to independently assume civil liabilities, the ability to independently undertake tender projects, and the ability to independently perform contracts.
2. With professional technical capabilities and after-sales service capabilities.
3. The applicant must provide the business license, organization code certificate, and tax registration certificate that are qualified for the annual review and are valid within the validity period.
4. Has good financial status and commercial credit, and has not committed major illegal acts in the past one year (provide nearly one year company audit report or audited financial statements). Not being ordered to suspend business, bids were cancelled, assets were taken over, frozen, and bankrupted. Have product qualification certificates or test reports and other product qualification certification documents.
5. If there is a major problem within the scope of China Southern Power Grid Co., Ltd. and the suspension of bid qualification by China Southern Power Grid Co., Ltd. or Guangdong Power Grid Co., Ltd. must be verified by Southern Grid or Guangdong Power Grid before bidding. Resume the bid qualification (suspend and resume bid qualifications are subject to the official website of the provincial and provincial companies).
6. The bidding unit's registered capital requirements are detailed in the special qualifications.
If the registered capital is in foreign currency, the bidder adopts a two-node control method, that is, the purchase price of the foreign exchange quoted price announced by the Bank of China on the day of registration, or the purchase price of the foreign exchange quoted by the Bank of China on the date of registration indicated on the bidder’s business license. Bidders who satisfy the registered capital requirements of any node control method are deemed to meet the requirements for bidding.
7. In order to prevent bidders from appearing among bidders, string bidding, and related transaction behaviors, if any of the following conditions exists, the involved units will all invalidate bids or repeal the winning bids:
(1) The person in charge of the unit is a bid for two or more units of the same person who are participating in the same or non-divided packages at the same time;
(2) The bids of the same subject that the controlling shareholder and the controlling shareholder participate in the same standard package or undivided standard package at the same time;
(3) The management and the managed entity participate in the bid for the same subject or at the same time without the same sub-package;
(4) At the same time, the subordinate affiliates of the same holding company participate in the same or non-divided bids.
8. The Bidder shall not have any direct or indirect connection with the consulting company or its affiliates entrusted by the Tenderee for the purpose of designing, compiling the specifications and other documents for the procurement of the Tendered Goods.
9. Does not accept the Commonwealth bid.
Special qualifications:
Target 1 Intelligent Clutter Control and Self-Healing Recovery System for AC/DC Hybrid Power Grid (Package 1: Intelligent AC/DC Hybrid Power Grid Control and Self-healing Recovery Application Software)
1. Requirements for registered capital of bidders: The registered capital of suppliers must not be less than 5 million yuan (RMB).
2. The software copyright of the bidding product.
3. Has a continuous record of more than three years (including three years) and a good track record.
Subject 1: Intelligent AC/DC hybrid power grid control and self-healing recovery system (Package 2: terminal workstation)
1. Requirements for registered capital of bidders: The registered capital of suppliers must not be less than 5 million yuan (RMB).
2. Manufacturers are required to provide valid production certification documents for the bid products. The agents or distributors must have a valid and unique authorization letter and after-sales service commitment from the manufacturer to issue the project, and they must not allow the agents and distributors to authorize them. Transfer rights to Others.
Target 2: Computer Server Upgrade and Capacity Expansion
1. Requirements for registered capital of bidders: The registered capital of suppliers must not be less than 5 million yuan (RMB).
2. Manufacturers are required to provide valid production certification documents for the bid products. The agents or distributors must have a valid and unique authorization letter and after-sales service commitment from the manufacturer to issue the project, and they must not allow the agents and distributors to authorize them. Transfer rights to others.
3. Has a continuous record of more than three years (including three years) and a good track record.
(2) Collection of Bidding Fees and Bid Security Deposits
Charge standard
The name of the subject matter, the name of the bid, the cost of the bid, the tender fee (yuan), the bid security
(ten thousand yuan)
1 AC/DC hybrid power grid intelligent delisting control and self-healing recovery system Package 1: AC/DC hybrid power grid intelligent decoupling control and self-healing recovery application software 100 1
Standard Package 2: Terminal Workstation 100 0.1
2 Computer Server Upgrade and Expansion / 100 0.1
2. Bidding costs are charged on-site when purchasing tender documents.
3. The bid bond must be submitted after the purchase of the bidding documents and before the deadline for submission of bids. The specific charging methods and requirements are detailed in the relevant provisions of the bidding documents.
(three) bid registration and access to tender documents
1. Any interested bidder is invited to: From September 19, 2016 to September 23, 2016, 9:00-11:30 am, 14:30-17:00 pm (Beijing time)
Contact: Qian Yong
Mobile:
phone
fax
E-mail:
In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.
Box Header