Jiangsu New Energy Power Generation Data Center completed and put into use

On May 14th, the State Grid Jiangsu Electric Power Co., Ltd. new energy power generation data center was officially put into use to achieve comprehensive monitoring of the province's 15 million kilowatt-scale new energy operation status.

Jiangsu New Energy Power Generation Data Center completed and put into use

After more than ten years of rapid development, Jiangsu New Energy has entered a stage of alternative energy with multiple varieties, large scales and wide geographical areas from a complementary energy stage with a single structure, limited quantity and sporadic distribution. The installed capacity has grown from 350,000 kilowatts in 2006 to In 2017, 14.3 million kilowatts, an increase of 40.8 times. At the end of 2016, based on years of actual operational experience, State Grid Jiangsu Power proposed to build a new energy power generation data center, and strive to achieve full process monitoring of new energy station operations.

Lu Xiao, director of Jiangsu Electric Power Control and Control Center, said: "We rely on the "big data + cloud computing" Internet architecture, follow the principles of data standardization, application intelligence, and service sustainability, relying on the national grid public service cloud to integrate systems and related societies. Resources, establish a shared cloud platform, realize the full consumption of new energy generation in the province and maximize the consumption of new energy outside the region, providing an effective solution for the management of new energy power generation."

The new energy power generation data center can alarm the abnormal single machine, statistically analyze the single-machine operation of each region, each manufacturer and each group, and provide index support for evaluating the power generation capacity of the new energy power station. “In the past, for new energy stations, we can only focus on monitoring the lines and lack the mastery of the operation of individual power generation units. Now with the data center, not only can we monitor each fan, but also the units of different manufacturers and different power generation groups. Conduct operation evaluation.” Lei Zhen, director of the Water New Division of Jiangsu Electric Power Control Center, introduced the single-machine meteorological data collected synchronously to calculate the theoretical power in real time, and combined the data of the wind tower and the irradiation monitor to correct the power prediction results.

It is understood that Jiangsu is the largest offshore wind power base in the country as a coastal wind energy resource-rich region. The data center combines numerical weather forecasting and offshore wind power single-machine meteorological data to realize the graphical display of offshore wind resources and carry out multi-wind field output prediction and correction. In the process of Jiangsu New Energy's output breaking 10 million kilowatts on March 5, offshore wind power prediction The highest accuracy is 94.13% and the highest correlation is 99%.

“With the new energy power generation data center, not only can we understand the operation of the whole station, but also the evaluation of equipment performance and on-site operation and maintenance level is well documented.” Xiao Jin, deputy director of the Health and Transportation Department of Guoxin Yancheng Wind Power Co., Ltd. said: “The two-way push function of the data center through the interactive platform of the plant network is equivalent to adding an insurance on the basis of the on-site duty. According to the abnormal situation of the data center and the predicted push, the data quality of Guoxin Wind Power has remained above 98%. ."

In addition, in order to solve the problems of low-voltage distributed PV monitoring and other problems, the data center realizes cross-platform data sharing with the electricity collection system, and uses distributed photovoltaic as the estimation model, combined with micro-meteorological monitoring, to estimate the global output of low-voltage distributed photovoltaics. New energy power generation "full monitoring, full forecast".

8GPU K37 Mining Rig

Specifications:
Model: K37-65mm
Color: Green
Material: SECC
Size: 70*40*18cm
Motherboard: K37
CPU: G1820
Memory: 4GB DDR3
Fans: 4*2800RPM turbo fans
Card distance: 65mm
Card slots: 8
Applicable graphics card: GPU P104,GPU P106,GPU 1660,GPU 3060,GPU 3070,GPU 3080,GPU 580,GPU 598, GPU 5600XT,GPU 5700XT
Quantity: 1 set

Packing list
1 x Mining Chassis
1 x Motherboard
4 x Cooling Fan
1 x 4GB DRR3
1 x G1820 CPU

1.Our mining GPU frame case is made of quality , the surface is flat and smooth, and the internal space is large.
2.The supply socket significantly improves motherboard performance.
3.High performance of computing, 8 x PCI-E 16X graphics card slots.
4.The voltage stabilizing capacitor can provide a stable voltage for your power supply equipment.
5.It can ensure quiet performance, low power consumption, less heat generation, energy saving, and safe use.

ethereum miner for sale,mining rig for sale,ethereum mining rig,cryptocurrency mining rigs,buy mining rig

Easy Electronic Technology Co.,Ltd , https://www.pcelectronicgroup.com

Posted on